Design & engineering
-
220 kV / 33 kV GIS substation for a data centre
Comprehensive detailed engineering for execution-ready project delivery.
Bajel Projects Ltd.Navi Mumbai, MaharashtraCompleted -
220 kV / 33 kV GIS substation for a data centre
Comprehensive detailed engineering for execution-ready project delivery.
Capchem Electricals Ltd.Thane, MaharashtraCompleted -
220 kV / 33 kV / 11 kV GIS substation for a utility
Detailed engineering for execution-ready project delivery.
Godrej & Boyce Mfg. Co. Ltd.Mumbai, MaharashtraCompleted -
220 kV / 22 kV GIS substation for a data centre
Comprehensive detailed engineering for execution-ready project delivery.
Capchem Electricals Ltd.Navi Mumbai, MaharashtraCompleted -
110 kV / 22 kV GIS substation for a data centre
Comprehensive detailed engineering for execution-ready project delivery.
Capchem Electricals Ltd.Navi Mumbai, MaharashtraCompleted -
220 kV / 33 kV AIS substation for a steel plant
Comprehensive detailed engineering for execution-ready project delivery.
Actemium India Process Ltd.KurnoolCompleted -
220 kV / 11 kV AIS substation for a utility
Comprehensive detailed engineering for execution-ready project delivery.
Godrej & Boyce Mfg. Co. Ltd.KarnatakaCompleted -
132 kV / 11 kV AIS substation for a utility
Comprehensive detailed engineering for execution-ready project delivery.
Cempower Consultancy ServicesUgandaCompleted -
132 kV / 33 kV AIS substation for a 72 MW solar plant
Pre-bid engineering support.
MAEIPLAkola, MaharashtraCompleted -
132 kV / 33 kV AIS substation for a 35 MW solar plant
Comprehensive detailed engineering for execution-ready project delivery.
MAEIPLSolapur, MaharashtraCompleted -
132 kV / 11 kV AIS substation for Talcher Fertilizers Ltd.
Comprehensive detailed engineering for execution-ready project delivery.
Larsen & Toubro Ltd.OdishaCompleted -
Gas turbine power plant with 132 kV GIS substation
Complete design and tender documentation for electrical and fire systems.
Arihant EngineersIraqCompleted -
MCGM water reservoir, 1,91,000 m³
Detailed MEP engineering for execution-ready project delivery.
Pednekar & AssociatesMumbai, MaharashtraCompleted -
MCGM water reservoir, 11,000 m³
Detailed MEP engineering for execution-ready project delivery.
Pednekar & AssociatesMumbai, MaharashtraCompleted -
MCGM Colony, Sion — Sectors A to E
Complete water supply system for execution-ready project delivery.
Pednekar & AssociatesMumbai, MaharashtraCompleted -
Sewer line and pumping station for an Air Force station
Complete sewer and drainage system for execution-ready project delivery.
Pednekar & AssociatesMumbai, MaharashtraCompleted -
Nitration plant for Seya Industries Pvt. Ltd.
Complete electrical design for a plant with more than 300 motors of various sizes.
Arihant EngineersBoisar, MaharashtraCompleted -
Super-speciality hospital
Complete design and tender documentation for electrical and public health systems.
Spectrum TechnologyNavi Mumbai, MaharashtraCompleted
Built by us
- 01MEP works, General Aviation Parking AreaAryan India Group · End user: Mumbai International Airport Ltd. (Adani)
- 02MEP works, Surface Movement Radar buildingAryan India Group · End user: Mumbai International Airport Ltd. (Adani) · G+2 and G+6 structures
- 03MEP works, Ghumti & Watch TowerAryan India Group · End user: Mumbai International Airport Ltd. (Adani)
- 04Electrical works, Airport Authority buildingKEC International Ltd. · End user: Mumbai International Airport Ltd.
- 05Mumbai Metro Package 3 — Science Museum stationDoğuş Soma JV · End user: Mumbai Metro Rail Corporation Ltd.
- 06Construction & demolition waste processing plant, DahisarAG Enviro Infra Projects Pvt. Ltd. on behalf of MCGM
- 07Water tank and pumping room, NeralThe House of Abhinandan Lodha
- 08Pre-cast RCC box culvert, Mumbai Coastal Road ProjectVishnu Enterprises for Godrej Construction · End user: L&T ECC on behalf of MCGM
- 09SICU, operating theatre and cath-lab electrical worksHoly Family Super Specialty Hospital, Bandra
- 1028.8 kWp rooftop solar PV plant, Siemens factory, KalwaPower House Electricals · End user: Siemens Ltd.
- 11Civil works for PEB shed, ISWM project, KanjurAntony Lara Enviro Solutions Pvt. Ltd.
Also: civil works for the HVDC substation at Kudus, finishing works at “The View”, Ghatkopar, and electrical works at Lenskart stores.
Audited by us
- 01Ashok Gardens Co-operative Housing Society Ltd.Electrical safety audit · 542 flats
- 02Miloni CHSL, NerulElectrical safety audit · 84 flats and common areas
- 03Kalpataru Residency, SionElectrical safety audit · 28 floors and common areas
- 04Ishwar Ecstasy, Nerul, Navi MumbaiElectrical safety audit
- 05Anti-Corruption Bureau, WorliElectrical safety audit
- 06Sassoon Hospital, PuneElectrical safety audit
- 07Chhatrapati Shivaji Maharaj Hospital, PuneElectrical safety audit
- 08Rajiv Gandhi Hospital, PuneElectrical safety audit
- 09Oscar Multi-Specialty Hospital, ThaneElectrical safety audit
- 10OML Entertainment Pvt. Ltd., Lower ParelElectrical safety audit
- 11MRCC IT SolutionsElectrical safety audit
- 12Russell India Pvt. Ltd.Electrical safety audit
References available
Want to speak to one of these clients?
Ask us, and we will arrange it.